T t I lll]IOA IIVISTllIIITS IIl'lITTO J]FL]1|1PA l\lII]I ](,{SIl.lPA At total of 1.53million tonnes at 1.8%f Cu is currently know and has been fully I evaluated. Mining will commence once the EIA has been approved. t 6.0 EXPLORATIONPROGRAM Ruida lnvestment Limited initiated geological exploration on the eastern side of the old open pit at Jifumpa mine covered by the extended area of the mining T license (appendix 3). As a result of this new exploration, an addition of 1.533 million tonnes of copper t ore reserves was discovered and added to the resource base. Plans are under way to exploit this resource by open pit mining method once the EIA has been approved by ZEMA. lmproved confidence level exploration is on-going. From the lo current information, a numerical block modelling was generated as given in t Figure 7 below l._ri T 1t0t I l-i r \ I I T To T I 6 Block model of the recent results Figure exploration T T t I 11 | P a g e U/tlsOr 1,4Oono AcSOc a eS I